
A serious lender does not hand over a painting on the strength of a handshake. Before even discussing insurance or transport, they want to know one thing: is your venue capable of keeping their work intact? The answer lies in a document that many galleries and foundations discover at the worst possible moment, when a museum insists on receiving it completed before approving a loan. The facility report describes, section by section, what your building can do in the face of climate, fire, theft and handling — and it weighs as heavily as the insurance policy in the final decision.
The facility report: your venue's technical identity card
The facility report — sometimes called a "facilities questionnaire" — is a standardised form describing the conservation and security capabilities of an exhibition space. It is not about the work being lent, but about the venue that will host it: temperature, relative humidity, lighting, fire detection, alarms, guarding, loading bays, trained staff.
Its role is simple. When an institution or a collector considers lending a piece, they have to assess a risk they do not control, within walls they do not know. The facility report gives them this information in a form that can be compared from one loan to the next. Major English-speaking lenders use the UK Registrars Group (UKRG) template, accompanied by a supplement devoted to security; in France, national museums rely on the questionnaire of the Mission sécurité, sûreté et accessibilité (MiSSA), the security and accessibility unit of the French Ministry of Culture, which may make a loan conditional on an on-site inspection.
A solid facility report opens doors: it reassures the lender, shortens negotiations and often reduces the insurance premium required. An incomplete file, by contrast, is enough to get a loan refused, even if the borrower is willing to pay. This is why a venue that regularly hosts works has every interest in keeping its report up to date, as a cornerstone of its insurance for museums and institutions.
Environmental conditions: climate, light and air quality
This is the most closely scrutinised section. A work suffers less from a "bad" climate than from an unstable one: it is sudden changes in temperature and humidity that crack a wooden panel, lift a paint layer or cockle a sheet of paper.
The long-accepted benchmarks are around 18 to 24 °C and 45 to 55% relative humidity, with a tolerance of a few points around the target value. Since the so-called Bizot protocol, many institutions accept broader ranges — of the order of 16 to 25 °C and 40 to 60% humidity — provided that changes remain slow and controlled. The facility report therefore asks less "what is your temperature?" than "how do you keep it stable, and how is it recorded?".
Three points come up every time:
- Regulation and monitoring. Air handling units, humidifiers, data loggers: the lender wants evidence, not intentions.
- Light levels. Sensitive works — drawings, prints, textiles, photographs — are measured in lux and cumulative exposure time. The aim is often 50 lux for the most fragile, 150 to 200 lux for an oil painting, with ultraviolet filtering.
- Air quality. Dust and pollutants, but also biological risk: an integrated pest and mould management plan reassures the lender about preventive conservation.
These requirements are not whims. They correspond directly to the causes of loss that a good policy covers, and they underpin the nail-to-nail cover on which the protection of the work depends throughout the loan.
Security and safety: the section that often tips the decision
Climate protects the work from time; security protects it from people and accidents. The facility report generally distinguishes two families of risk, sometimes dealt with in a separate supplement.
Security concerns deliberate acts: theft, vandalism, intrusion. The lender examines guarding, both human and CCTV, intrusion detection, access control to storage areas, the resistance of display cases and opening and closing procedures. A magnificent room with no night-time surveillance will not host a major piece. Safety concerns accidental losses: fire, water damage, technical failure. Automatic detection and suppression, fire compartmentation, an emergency plan for evacuating the works, the location of plant rooms and pipework above the galleries: all of this goes into the file. Fire destroys, but water — from badly routed pipes or a leak — does just as much damage in storage areas every year.For high-value French loans, the inspection may go further than a simple form: a visit from MiSSA, with recommendations to be implemented before the work arrives. It is better to anticipate this than to hold up an exhibition schedule a few weeks before the opening.
Handling, display cases and staff: the details that engage liability
A venue can boast a perfect climate and lose a loan over a logistical detail. The facility report examines the complete chain by which the work enters, moves around and leaves.
The questions cover the loading bay, covered or not, the dimensions of doors and lifts, whether there is an acclimatisation area where crates rest before opening, the storage space for empty crates and, above all, the qualifications of the people who handle the pieces. A demanding lender will ask for installation to be carried out by specialist art handlers, sometimes under the eye of a courier they have appointed.
Display cases deserve their own section: inert materials, airtightness, a secure locking system, possibly a hygroscopic buffer to stabilise the internal microclimate. For a sculpture or an object shown in a case, these elements weigh as much as the room's alarm.
This section ties in with the work described in our guide to the checks an owner should make before lending a work: the lender inspects the venue, and the borrower must prove that it controls every link in the chain.
What insurers read in a facility report
A facility report is not just a formality between institutions: it is also a document that the insurer and broker examine to calibrate the cover and the premium. A well-equipped venue reduces the likelihood of a loss, and therefore the cost of the risk. Conversely, a documented weakness can lead to an exclusion, a higher deductible or a special condition.
The table below links, as a benchmark, the sections of the report to the insurance questions they raise. As every situation is different, it helps with reading the report without replacing the analysis of a specialist broker.
| Facility report section | What the insurer looks for | Possible consequence for the policy |
|---|---|---|
| Climate and humidity | Stability and recording of readings | Basis for cover of physical damage |
| Security (theft, intrusion) | Guarding, alarms, access control | Level of theft cover, minimum requirements |
| Safety (fire, water) | Detection, suppression, emergency plan | Exclusions or additional premium if weak |
| Handling and staff | Qualifications, couriers, acclimatisation | Cover for installation and de-installation phases |
| Display cases and hanging | Security and microclimate of displays | Special conditions for fragile objects |
One principle must never be lost from sight: whatever the quality of the venue, compensation depends on the value stated in the policy. An all risks policy on an agreed value basis fixes this amount in advance, by mutual agreement, and avoids post-loss negotiation. The facility report protects the work during the exhibition; the agreed value protects the owner's assets if, despite everything, the worst happens.
Lender side, borrower side: who fills in what
The facility report is completed by the borrower — the host venue — and then sent to the lender, who assesses it. The lender may ask for further information or a visit, or set conditions before agreeing. This dialogue precedes the signing of the loan agreement and the arrangement of insurance; it does not replace them.
Be careful not to confuse the facility report with the condition report on the work. The former describes the venue, in advance and for the whole duration of the exhibition; the latter describes the work, precisely on departure and on return, to prove any damage. The two documents complement each other: one explains whether the risk was under control, the other establishes what happened.
For an organiser, the right approach is to prepare the facility report well before requesting loans, have it reviewed by a broker and update it whenever the building changes. It is often this file, more than any argument about prestige, that wins over a major lender. Before putting on an exhibition that relies on borrowed works, a fine art insurance quote lets you check that the expected cover and the venue's real capabilities match up.
FAQ
What is a facility report for an art loan?
It is a standardised questionnaire describing a venue's capacity to conserve and protect a work: climate, lighting, security, fire safety, handling and staff. The borrowing venue completes it and sends it to the lender, who uses it to decide whether to entrust them with the piece.
Does the facility report replace insurance?
No. It describes the venue and often determines whether the loan is agreed, but it covers no loss. Insurance, ideally an all risks policy on an agreed value basis, remains essential. The report only influences the conditions, and sometimes the premium, required by the insurer.
What climatic conditions must a venue guarantee?
The usual benchmarks are around 18 to 24 °C and 45 to 55% relative humidity, with a tolerance of a few points. More than the exact value, it is stability and the recording of readings that count: sudden swings damage works more than a constant climate that is slightly different.
Who fills in the facility report, the lender or the borrower?
The borrower, meaning the venue hosting the exhibition. It describes its own facilities and procedures, then sends the document to the lender. The lender may ask for clarification, an on-site visit or adjustments before agreeing to the loan.
Are a facility report and a condition report the same thing?
No. The facility report describes the host venue and its protective capabilities. The condition report describes the work itself, on departure and on return, to establish any damage. The two documents are complementary and come into play at different stages of the loan.
Can a modest venue borrow a highly valuable work?
It is possible but more difficult. A lender adjusts its requirements to the value and fragility of the piece. A gallery or foundation can make up for modest premises with secure display cases, reinforced guarding and impeccable insurance, all documented in the facility report.